WIMS · INSTALL MARGINOutage diagnostic briefing

Scenario demo · Execution gate

Follow one diagnostic signal from schedule slice to decision.

Pick a scope, then switch the look-ahead on and off. Each slice shows what the diagnostic agent found, what the PRA view would show next to it, and which WIMS dimensions receive the evidence.

PRISM look-ahead
  1. 1 · Schedule sliceOutage schedule and work orders
  2. 2 · PRISM agentDeterministic checks
  3. 3 · PRA viewLicensee risk monitor, side by side
  4. 4 · WIMSDimension evidence and gate status
  5. 5 · SRO decisionHuman authority, unchanged

WIMS dimension coverage for this scenario

Where the diagnostic evidence lands.

Counts are synthetic signals from the six slices above. Greyed dimensions receive no PRISM evidence and rely on other WIMS sources.

How to read this

A teaching exercise, not a simulation.

Slices, equipment and findings are fictional and simplified. Tech spec references follow the standard PWR structure only as labels. Lead times are illustrative. The risk-monitor column stands in for whatever the licensee's PRA group reports; this demo does not calculate risk.

Connection to the case explorer

These three scopes match the common workstreams in the WIMS Industry Case Explorer: reactor coolant pumps, steam generators and the existing turbine centerline. This demo adds the in-outage diagnostic layer at the Execution and Return to Service gates.

Back to why PRISM